IBM 8487 User Manual - Page 33

Installing options, Installation guidelines, System reliability guidelines

Page 33 highlights

Chapter 4. Installing options This chapter provides detailed instructions for adding hardware options to the server. Installation guidelines Before you begin installing options in the server, read the following information: v Review the safety information beginning at "Safety information" on page 107 and the guidelines in "Handling static-sensitive devices" on page 24. This information will help you work safely with the server and options. v When you need to access the inside of the server to install options, you might find it easier to lay the server on its side. v Make sure that you have an adequate number of properly grounded electrical outlets for the server, monitor, and other devices that you will connect to the server. v Back up all important data before you make changes to disk drives. v Have a small flat-blade screwdriver available. v You do not need to turn off the server to install or replace hot-swap drives, or hot-plug Universal Serial Bus (USB) devices. v Blue on a component indicates touch points, where you can grip the component to remove it from or install it in the server, open or close a latch, and so on. v Orange on a component or orange label on or near a component indicates that the component can be hot-swapped, which means that if the server and operating system support hot-swap capability, you can remove or install the component while the server is running. (Orange can also indicate touch points on hot-swap components.) See the instructions for removing and installing a specific hot-swap component for any additional procedures that you might have to perform before you remove or install the component. v For a list of supported options for the server, go to http://www.ibm.com/pc/us/ compat/. System reliability guidelines To help ensure proper cooling and system reliability, make sure that: v Each of the drive bays has a drive or a filler panel and electromagnetic compatibility (EMC) shield installed in it. v There is adequate space around the server to allow the server cooling system to work properly. Leave approximately 50 mm (2 in.) of open space around the front and rear of the server. Do not place objects in front of the fans. For proper cooling and airflow, replace the server cover before turning on the server. Operating the server for extended periods of time (more than 30 minutes) with the server cover removed might damage server components. When installing the server in a rack, make sure that space is available around the server to enable the server cooling system to work properly. See the documentation that comes with the rack for additional information. v You have followed the cabling instructions that come with optional adapters. v You have replaced a failed fan within 48 hours. v You have replaced a hot-swap drive within 2 minutes of its removal. © Copyright IBM Corp. 2004, 2007 23

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160

Chapter 4. Installing options
This chapter provides detailed instructions for adding hardware options to the
server.
Installation guidelines
Before you begin installing options in the server, read the following information:
v
Review the safety information beginning at “Safety information” on page 107 and
the guidelines in “Handling static-sensitive devices” on page 24. This information
will help you work safely with the server and options.
v
When you need to access the inside of the server to install options, you might
find it easier to lay the server on its side.
v
Make sure that you have an adequate number of properly grounded electrical
outlets for the server, monitor, and other devices that you will connect to the
server.
v
Back up all important data before you make changes to disk drives.
v
Have a small flat-blade screwdriver available.
v
You do not need to turn off the server to install or replace hot-swap drives, or
hot-plug Universal Serial Bus (USB) devices.
v
Blue on a component indicates touch points, where you can grip the component
to remove it from or install it in the server, open or close a latch, and so on.
v
Orange on a component or orange label on or near a component indicates that
the component can be hot-swapped, which means that if the server and
operating system support hot-swap capability, you can remove or install the
component while the server is running. (Orange can also indicate touch points on
hot-swap components.) See the instructions for removing and installing a specific
hot-swap component for any additional procedures that you might have to
perform before you remove or install the component.
v
For a list of supported options for the server, go to http://www.ibm.com/pc/us/
compat/.
System reliability guidelines
To help ensure proper cooling and system reliability, make sure that:
v
Each of the drive bays has a drive or a filler panel and electromagnetic
compatibility (EMC) shield installed in it.
v
There is adequate space around the server to allow the server cooling system to
work properly. Leave approximately 50 mm (2 in.) of open space around the front
and rear of the server. Do not place objects in front of the fans. For proper
cooling and airflow, replace the server cover before turning on the server.
Operating the server for extended periods of time (more than 30 minutes) with
the server cover removed might damage server components.
When installing the server in a rack, make sure that space is available around
the server to enable the server cooling system to work properly. See the
documentation that comes with the rack for additional information.
v
You have followed the cabling instructions that come with optional adapters.
v
You have replaced a failed fan within 48 hours.
v
You have replaced a hot-swap drive within 2 minutes of its removal.
© Copyright IBM Corp. 2004, 2007
23