IBM 8649 Hardware Maintenance Manual - Page 52
static-protective
UPC - 000435133427
View all IBM 8649 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 52 highlights
10. Carefully grasp the adapter by the top edge or upper corners, and align it with the expansion slot guides; then, press the adapter firmly into the expansion slot. Move the adapter directly from the static-protective package to the adapter slot. Expansion-slot cover Rear adapterretaining bracket Adapter Front adapterretaining bracket 11. Connect required cables to the adapter. Route cables so that they do not block the flow of air from the fans. If you are installing an optional SCSI adapter, see "Cabling an optional SCSI adapter" on page 43 for additional information. 12. If you have another adapter to install, repeat steps 5 through 11. 13. If you have installed a full-length adapter, rotate the front adapter-support bracket to the closed (locked) position. 14. Reinstall the rear adapter-retention bracket; then, rotate the bracket to the closed (locked) position. Note: If any adapters in your server are large or have heavy cables attached to them, you can remove the rear adapter-retention bracket and secure all of the adapters with expansion-slot screws. The expansion-slot screws are stored on the frame-support bracket. 15. If you have other options to install, do so now; otherwise, continue with step 16. 16. Replace the support bracket (see "Removing and installing the support bracket" on page 38). 17. Replace the side cover (see "Replacing the side cover" on page 67). 18. Reconnect the external cables and power cords; then, turn on the attached devices and the server. 42 IBM xSeries 225 Types 8649: Hardware Maintenance Manual and Troubleshooting Guide