IBM 8649 Hardware Maintenance Manual - Page 76
Completing, option, installation, Replacing, bezel
UPC - 000435133427
View all IBM 8649 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 76 highlights
Completing the option installation To complete installation of an option, you must reinstall the bezel, reinstall the server cover, reconnect all the cables that you disconnected earlier and, for certain options, run the Configuration/Setup Utility program. Follow the instructions in this section. Attention: For proper cooling and airflow, replace the server cover before or shortly after turning on the server. Operating the server for extended periods of time (over 30 minutes) with the server cover removed might damage server components. Note: If you have just plugged the power cords of your server into electrical outlets, you will have to wait approximately 20 seconds before pressing the power-control button. Replacing the bezel The following illustration shows how to install the bezel on the server. Complete the following steps to replace the bezel: 1. Insert the two tabs on the bottom of the bezel into the matching holes on the server chassis. 2. Push the top of the bezel toward the server until the two tabs at the top of the bezel snap into place. 3. For hot-swap hard disk drive models, make sure the side cover is unlocked; then, insert the hot-swap lock bar into the slots on the bezel and rotate it to the locked position. The hot-swap lock bar locks when you lock the side cover key lock. 66 IBM xSeries 225 Types 8649: Hardware Maintenance Manual and Troubleshooting Guide