Intel SC5600BASE Service Guide - Page 64

Replacing the Hot Swap Power Supply Power, Distribution Board

Page 64 highlights

Hardware Installations and Upgrades Replacing the Hot Swap Power Supply Power Distribution Board WARNING Hazardous voltage, current, and energy levels are present inside the power supply. There are no user-serviceable parts inside it; servicing should be done by technically qualified personnel. 1. Observe the safety and ESD precautions at the beginning of this book. 2. Power down the server and unplug all peripheral devices and the AC power cable. 3. Remove the chassis cover. For instructions, see "Removing the Chassis Cover." 4. Remove the air duct. For instructions, see "Removing the Air Duct." 5. Press on the green latch on the power supply (see letter "A" in Figure 56) while pulling on the handle (see letter "B" in Figure 56) to remove the power supply from the chassis. Repeat this step for the second power supply. Figure 56. Removing Hot Swap Power Supply from Chassis 6. Disconnect all internal power cables from the chassis components and server/workstation board. See the Quick Start User's Guide or Service Guide provided with your Intel server/workstation board for the appropriate connection location. 7. Remove the screws (see letters "A" and "B" in the following figure) securing the filler panel to the chassis, and remove the power supply filler panel from the chassis. 50 Intel® Server Chassis SC5600 Service Guide

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118

Hardware Installations and Upgrades
50
Intel®
Server Chassis SC5600 Service Guide
Replacing the Hot Swap Power Supply Power
Distribution Board
WARNING
Hazardous voltage, current, and energy levels are present inside the power supply. There are no
user-serviceable parts inside it; servicing should be done by technically qualified personnel.
1.
Observe the safety and ESD precautions at the beginning of this book.
2.
Power down the server and unplug all peripheral devices and the AC power cable.
3.
Remove the chassis cover. For instructions, see “Removing the Chassis Cover.”
4.
Remove the air duct. For instructions, see “Removing the Air Duct.”
5.
Press on the green latch on the power supply (see letter “A” in Figure 56) while pulling on the handle (see
letter “B” in Figure 56) to remove the power supply from the chassis. Repeat this step for the second
power supply.
Figure 56. Removing Hot Swap Power Supply from Chassis
6.
Disconnect all internal power cables from the chassis components and server/workstation board. See the
Quick Start User’s Guide
or
Service Guide
provided with your Intel server/workstation board for the
appropriate connection location.
7.
Remove the screws (see letters “A” and “B” in the following figure) securing the filler panel to the chassis,
and remove the power supply filler panel from the chassis.