Intel SC5600BASE Service Guide - Page 66

Removing Power Distribution Board from Hot Swap Power Supply Cage, Attaching

Page 66 highlights

Hardware Installations and Upgrades / NOTE Cables on the back of the power distribution board are not shown to clarify the removal process. Figure 60. Removing Power Distribution Board from Hot Swap Power Supply Cage 11. Attach the new power distribution board to the hot swap power supply cage, position the power distribution board screw holes to the matching power supply cage mounting holes (see letter "A" and "B" in Figure 61), and secure the screws. / NOTE Cables on the back of the power distribution board are not shown to clarify the installation process. Figure 61. Attaching Power Distribution Board to Hot Swap Power Supply Cage 12. Re-insert the hot swap power supply cage into the chassis power supply bay. Try to route the power cables to the appropriate area at the time of insertion (see Step 13). 52 Intel® Server Chassis SC5600 Service Guide

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118

Hardware Installations and Upgrades
52
Intel®
Server Chassis SC5600 Service Guide
/
NOTE
Cables on the back of the power distribution board are not shown to clarify the removal process.
Figure 60. Removing Power Distribution Board from Hot Swap Power Supply Cage
11. Attach the new power distribution board to the hot swap power supply cage, position the power
distribution board screw holes to the matching power supply cage mounting holes (see letter “A” and “B” in
Figure 61), and secure the screws.
/
NOTE
Cables on the back of the power distribution board are not shown to clarify the installation process.
Figure 61. Attaching Power Distribution Board to Hot Swap Power Supply Cage
12. Re-insert the hot swap power supply cage into the chassis power supply bay. Try to route the power
cables to the appropriate area at the time of insertion (see Step 13).