Toshiba T42F3F500XAMBN User Manual - Page 16
Unpacking/Inspection/Storage/Disposal
View all Toshiba T42F3F500XAMBN manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 16 highlights
TOSHIBA 2.0 Unpacking/Inspection/Storage/Disposal 2.1 Unpacking the new UPS equipment 15/25/30 kVA: Upon receipt of the UPS, a careful inspection for shipping damage should be made. Units shipped within North America are shrink-wrapped; those outside North America are crated. 1. Remove packing material. 1a. For international units, remove the screws that attach the shipping crate to the pallet. Remove the crate and foam packing material. 2. Unbolt the rails from both the unit and the shipping pallet. Place the rails on the front of the pallet. Use the four 1/2 x 3" bolts to secure the rails to the shipping pallet. Attach the rails as shown in the front to the front of the pallet. 3. Place the tie brackets in the slots at the lower end of the ramps. SLOWLY roll the unit down the ramp. DANGER TOP HEAVY EQUIPMENT. IMPROPER LIFTING CAN RESULT IN INJURY OR DEATH. LIFT AND MOVE CAREFULLY AND ONLY WITH ADEQUATE EQUIPMENT AND TRAINED PERSONNEL. THIS EQUIPMENT WILL TIP OVER EASILY UNTIL FIXED IN PLACE. 4200FA CT/XT User's Manual 15