Toshiba T42F3F500XAMBN User Manual - Page 26

Power Connections 50 kVA

Page 26 highlights

TOSHIBA 4.3 Power Connections 50 kVA The following illustrates the wiring connections from the power distribution panel (not part of the UPS) to the terminal block of the 50 kVA UPS Model (H1) (H2) (H3) (N) (L1) (L2) (L3) (N) (+) (-) INPUT: 3-phase, 3-wire 208 V requires 3-phase, 4-wire OUTPUT: 3-phase (4-wire) TB1 (H1) (H2) (H3) (N) Optional: Bypass Input: 3-phase, 3-wire 208 V requires 3-phase, 4-wire TB4 4200FA CT/XT User's Manual 25

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68

TOSHIBA
4.3
Power Connections 50 kVA
The following illustrates the wiring connections from the power distribution panel (not
part of the UPS) to the terminal block of the 50 kVA UPS Model
(H1)
(H2)
(H3)
(N)
(L1)
(L2)
(L3)
(N)
(+)
(-)
OUTPUT: 3-phase (4-wire)
INPUT: 3-phase, 3-wire
208 V requires 3-phase,
4-wire
TB1
Optional: Bypass Input:
3-phase, 3-wire
208 V requires 3-phase,
4-wire
(H1)
(H2)
(H3)
(N)
TB4
4200FA CT/XT User’s Manual
25