Xerox 6180N DocuSP 61xx version 3.6 - Installation Planning Guide - Page 30

Line to Neutral

Page 30 highlights

Select and prepare an installation site • 32 amps per phase • If you have existing 3-phase, 220/230 VAC, 25 amp/phase electrical service, or plan to have this service installed, it must meet the following specifications: 30 amps per phase minimum - Line to Neutral 220 x 6% 230 x 6% 240 x 6% 250 x 6% - Line to Line 380 VAC (nominal) 400 VAC (nominal) 415 VAC (nominal) 440 VAC (nominal) Power cable locations The orientation of the printer and the location of the power cord or cords determines where the receptacles should be installed. The lengths of each cable are listed in the section, Power cable lengths. Single power cable configuration (50 Hz, 60 Hz) • 50 amp cable: the printer 50 amp cable is located at the rear of the printer at the left, or processor, end of the printer. • 15 amp cable: the 15 amp Sun controller cable is located at the rear of the Sun controller. Be sure to note the location of the controller when planning the electrical connections. Dual power cable configuration (60 Hz) • 50 amp and 30 amp cables: the 50 amp and 30 amp cables are located to the rear at the left, or processor, end of the printer. • 15 amp cable: the 15 amp cable is located to the rear of the Sun controller. Be sure to plan the location of the controller when planning the electrical connections. 4-12 DocuTech 61xx Installation Planning Guide

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60

Select and prepare an installation site
4-12
DocuTech 61xx Installation Planning Guide
32 amps per phase
If you have existing 3-phase, 220/230 VAC, 25 amp/phase
electrical service, or plan to have this service installed, it must
meet the following specifications:
30 amps per phase
minimum
Line to Neutral
220
x 6%
230
x 6%
240
x 6%
250
x 6%
Line to Line
380 VAC (nominal)
400 VAC (nominal)
415 VAC (nominal)
440 VAC (nominal)
Power cable locations
The orientation of the printer and the location of the power cord
or cords determines where the receptacles should be installed.
The lengths of each cable are listed in the section, Power cable
lengths.
Single power cable configuration (50 Hz, 60 Hz)
50 amp cable: the printer 50 amp cable is located at the rear
of the printer at the left, or processor, end of the printer.
15 amp cable: the 15 amp Sun controller cable is located at
the rear of the Sun controller. Be sure to note the location of
the controller when planning the electrical connections.
Dual power cable configuration (60 Hz)
50 amp and 30 amp cables: the 50 amp and 30 amp cables
are located to the rear at the left, or processor, end of the
printer.
15 amp cable: the 15 amp cable is located to the rear of the
Sun controller. Be sure to plan the location of the controller
when planning the electrical connections.