Xerox 6180N DocuSP 61xx version 3.6 - Installation Planning Guide - Page 35
Properly functioning HVAC.
UPC - 095205425307
View all Xerox 6180N manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 35 highlights
Select and prepare an installation site Use the following table to find the appropriate system and venting configuration in the column labeled: Replaced system. Read across that row to find the Heat output for that system. Record this value on the Heat Management Worksheet. Table 4-7. Copier heat output Replaced system 9900 Vented 9900 Unvented 5090 Vented 5090 Unvented 9700 Vented 9700 Unvented 9500 Vented 9500 Unvented 1090 Unvented EK235â Unvented EK250â Unvented EK300â Unvented Heat output (BTU per hr.) 17,000 25,000 19,000 27,000 24,000 31,000 17,000 24,000 12,000 14,000 22,000 22,000 NOTE: Vented heat output values assume a vented airflow of 200 CFMs. Heat management process The procedure that follows describes the heat management assessment process. 1. Assess current conditions: Consider the following items when assessing the current conditions: • Maximum heat load in the room with existing equipment. • High outside temperatures. • Properly functioning HVAC. 2. Determine acceptable maximum temperature: Consider the following items when determining the maximum acceptable temperature: • Operator comfort and safety. DocuTech 61xx Installation Planning Guide 4-17