Xerox 6180N DocuSP 61xx version 3.6 - Installation Planning Guide - Page 35

Properly functioning HVAC.

Page 35 highlights

Select and prepare an installation site Use the following table to find the appropriate system and venting configuration in the column labeled: Replaced system. Read across that row to find the Heat output for that system. Record this value on the Heat Management Worksheet. Table 4-7. Copier heat output Replaced system 9900 Vented 9900 Unvented 5090 Vented 5090 Unvented 9700 Vented 9700 Unvented 9500 Vented 9500 Unvented 1090 Unvented EK235â Unvented EK250â Unvented EK300â Unvented Heat output (BTU per hr.) 17,000 25,000 19,000 27,000 24,000 31,000 17,000 24,000 12,000 14,000 22,000 22,000 NOTE: Vented heat output values assume a vented airflow of 200 CFMs. Heat management process The procedure that follows describes the heat management assessment process. 1. Assess current conditions: Consider the following items when assessing the current conditions: • Maximum heat load in the room with existing equipment. • High outside temperatures. • Properly functioning HVAC. 2. Determine acceptable maximum temperature: Consider the following items when determining the maximum acceptable temperature: • Operator comfort and safety. DocuTech 61xx Installation Planning Guide 4-17

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60

Select and prepare an installation site
DocuTech 61xx Installation Planning Guide
4-17
Use the following table to find the appropriate system and
venting configuration in the column labeled: Replaced system.
Read across that row to find the Heat output for that system.
Record this value on the Heat Management Worksheet.
NOTE:
Vented heat output values assume a vented airflow of
200 CFMs.
Heat management process
The procedure that follows describes the heat management
assessment process.
1.
Assess current conditions: Consider the following items when
assessing the current conditions:
Maximum heat load in the room with existing equipment.
High outside temperatures.
Properly functioning HVAC.
2.
Determine acceptable maximum temperature: Consider the
following items when determining the maximum acceptable
temperature:
Operator comfort and safety.
Table 4-7. Copier heat output
Replaced system
Heat output (BTU per
hr.)
9900 Vented
17,000
9900 Unvented
25,000
5090 Vented
19,000
5090 Unvented
27,000
9700 Vented
24,000
9700 Unvented
31,000
9500 Vented
17,000
9500 Unvented
24,000
1090 Unvented
12,000
EK235â Unvented
14,000
EK250â Unvented
22,000
EK300â Unvented
22,000