Bowflex Power Pro Assembly Manual - Page 14
Chest Bar Assembly Instructions, Step 2, Step 1, Step 4, Step 3
View all Bowflex Power Pro manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 14 highlights
Chest Bar Assembly Instructions Step 1: Slide Seat to end of seat rail and lower to flat position. Components for this assembly are in a box labeled Chest Bar Attachment Step 2: Remove indicated bolts going through pulley frame and Vertical Main Frame. Vertical Main Frame Remove the Vertical Main Frame with Rod Pack and set aside. Note: Do not lose, these bolts will need to be used in a later step. Remove both top and bottom bolt Step 3: Remove bolts connecting U-Bar to machine base. Note: Do not lose, these bolts will need to be used in a later step. Pulley Frame Remove both bolts Step 4: Remove U-Bar from machine base. 15
Chest Bar Assembly Instructions
Step 2:
Remove indicated bolts going through pulley
frame and Vertical Main Frame.
Remove the Vertical Main Frame with Rod Pack
and set aside.
Note:
Do not lose, these bolts will need to
be used in a later step.
Step 1:
Slide Seat to end of seat rail and lower
to flat position.
Step 4:
Remove U-Bar from machine base.
Step 3:
Remove bolts connecting U-Bar to machine base.
Note:
Do not lose, these bolts will need to
be used in a later step.
15
Pulley Frame
Remove both bolts
Components for this assembly
are in a box labeled
Chest Bar Attachment
Vertical Main Frame
Remove both top
and bottom bolt