Cisco WS-CBS3020-HPQ Installation Guide - Page 73
Connecting the Power Converter to an AC Power Source, Preparing the AC Power Cord,
View all Cisco WS-CBS3020-HPQ manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 73 highlights
Chapter 2 Switch Installation Connecting the Switch to the Power Converter Follow these steps to connect DC power from the power converter to the switch module. Step 1 Step 2 Locate the DC power clip in the power converter accessory kit. Position the power clip so that the two-pin connector is over the power converter and the four-pin connector is over the switch Pwr A connector, and then slide the power clip into these two connectors. See Figure 2-41. Figure 2-41 1 Connecting Wires to the Power Converter DC Output Terminal Block 2 3 5 1 6 2 7 1 3 8 2 4 CONSOLE 202298 1 DC power clip 3 Four-pin connector on the switch 2 Two-pin connector on the power convertor Step 3 Use a ratcheting torque flathead screwdriver to tighten the captive screw to 2 in-lb. Caution Do not over-torque the power and relay connector captive screws. The torque should not exceed 2 in-lb. Connecting the Power Converter to an AC Power Source These sections describe the steps required to connect the power converter to an AC power source: • Preparing the AC Power Cord, page 2-47 • Connecting the AC Power Cord to the Power Converter, page 2-48 Preparing the AC Power Cord To connect the power converter to an AC power source, you need a standard 18-gauge unterminated AC power cord. See Figure 2-42. Power cord connector types vary by country. Power-cord color codes also vary by country. See Table 2-2. Note Use copper conductors only, rated at a minimum temperature of 167°F (75°C). OL-13017-01 Cisco IE 3000 Switch Hardware Installation Guide 2-47