Compaq ProLiant 1850R Compaq ProLiant 1850R Setup and Installation Guide - Page 104

Installing a Full-Height Device (DLT Tape Drive

Page 104 highlights

3-29 6. Push the server into the rack and secure it. 7. Reconnect the power cord and power on the server. 8. Reconfigure the server. See to Chapter 5, "Using the System Configuration Utility," for more information. Installing a Full-Height Device (DLT Tape Drive) To install a full-height device into the removable media bay area: 1. Remove both removable media trays in bay areas A and B. See the "Installing a 3.5-inch Drive into a 5.25-inch Drive Bay" procedure above and follow steps 1 through 6. 2. Remove the two T-15 torx screw securing the media trays to the chassis and slide the trays out of the server. Figure 3-32. Removing the two removable media trays from the removable media cage 3. Insert the DLT tape drive into the removable media bay area and secure from the bottom of the unit with four T-7 Torx screws. Compaq ProLiant 1850R Setup and Installation Guide

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203

3-29
Compaq ProLiant 1850R Setup and Installation Guide
6.
Push the server into the rack and secure it.
7.
Reconnect the power cord and power on the server.
8.
Reconfigure the server. See to Chapter 5,
Using the System
Configuration Utility,
for more information.
Installing a Full-Height Device
(DLT Tape Drive)
To install a full-height device into the removable media bay area:
1.
Remove both removable media trays in bay areas A and B. See the
Installing a 3.5-inch Drive into a 5.25-inch Drive Bay
procedure above
and follow steps 1 through 6.
2.
Remove the two T-15 torx screw securing the media trays to the chassis
and slide the trays out of the server.
Figure 3-32.
Removing the two removable media trays from the removable
media cage
3.
Insert the DLT tape drive into the removable media bay area and secure
from the bottom of the unit with four T-7 Torx screws.