Dell Force10 S25N-S50N Installing S25N and S25V Systems - Page 23
Four-Post Rack-mounting with Cage Nuts, Installing S25N and S25V Systems
View all Dell Force10 S25N-S50N manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 23 highlights
Step 3 Task Set the adjustable rear mounting bracket to the length (one of three lengths) for your bracket. Secure the length with the four screws. Figure 7 Four-post Rack-mounting with Threaded Rails fn00148S25N AC STACK ID XFP25 XFP26 Alarm DC 27 P28 S50-01-GE-24V Four-Post Rack-mounting with Cage Nuts Installing S25N and S25V Systems 23
Installing S25N and S25V Systems
23
Four-Post Rack-mounting with Cage Nuts
3
Set the adjustable rear mounting bracket to the length (one of three lengths) for your bracket. Secure the length
with the four screws.
Figure 7
Four-post Rack-mounting with Threaded Rails
fn00148S25N
Step
Task