Dell Force10 Z9000 Installing the Z9000 System - Page 15
Site Preparations, Site Selection
View all Dell Force10 Z9000 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 15 highlights
3 Site Preparations The Z9000 is suitable for installation as part of a Common Bond Network (CBN). It can be installed in: • network telecommunication facilities • data centers • other locations where the National Electric Code (NEC) applies This chapter contains the following sections: • Site Selection • Cabinet Placement • Rack Mounting • Grounding • Fans and Airflow • Power • Storing Components For more information about Z9000 specifications, refer to Specifications. NOTE: Install the Z9000 chassis into a rack or cabinet before installing any optional components. Site Selection Dell Force10 equipment is intended for installation in restricted access areas. A restricted access area is one in which access can only be gained by service personnel through the use of a special tool, lock, key, or other means of security and access is controlled by the authority responsible for the location. Ensure that the area where you install your Z9000 meets the following safety requirements: • Near an adequate power source. Connect the system to the appropriate branch circuit protection as defined by your local electrical codes. • Environmental temperature between 32° to 104°F (0° to 40°C). • Relative humidity that does not exceed 85% non-condensing. • In a dry, clean, well-ventilated and temperature-controlled room, away from heat sources such as hot air vents or direct sunlight. • Away from sources of severe electromagnetic noise. • Positioned in a rack or cabinet, or on a desktop with adequate space in the front, rear, and sides of the Z9000 for proper ventilation and access. Site Preparations | 15