Dell Force10 Z9000 Installing the Z9000 System - Page 7

Preface, About this Guide, Related Publications

Page 7 highlights

1 Preface About this Guide This guide provides Z9000 site preparation recommendations, step-by-step procedures for rack mounting and desk mounting, inserting optional modules, and connecting to a power source. After you have completed the hardware installation and power-up of the Z9000 system, for software configuration information, refer to the FTOS Configuration Guide for the Z9000 System and for Command Line Interface (CLI) information, refer to the FTOS Command Line Reference Guide for the Z9000 System. NOTE: The Z9000 system requires, at a minimum, Dell Force10 Operating System (FTOS) version 8.3.11.0. CAUTION: Wear grounding wrist straps when handling this equipment to avoid Electrostatic Discharge (ESD) damage. WARNING: Only trained and qualified personnel can perform the installation of this equipment. Read this guide before you install and power up the Z9000 system. This equipment contains two power cords. Disconnect both power cords before servicing. WARNING: This equipment contains optical transceivers, which comply with the limits of Class 1 laser radiation. WARNING: When no cable is connected, visible and invisible laser radiation may be emitted from the aperture of the optical transceiver ports. Avoid exposure to laser radiation and do not stare into the open apertures. Related Publications For more information about the Z9000 system, refer to the following documents: • FTOS Configuration Guide for the Z9000 System • FTOS Command Line Reference Guide for the Z9000 System • FTOS Release Notes for the Z9000 System NOTE: For the most recent documentation and software, visit iSupport (registration for access to some sections is required): https://www.force10networks.com/CSPortal20/Main/SupportMain.aspx. Preface | 7

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56

Preface
|
7
1
Preface
About this Guide
This guide provides Z9000 site preparation recommendations, step-by-step procedures for rack mounting
and desk mounting, inserting optional modules, and connecting to a power source.
After you have completed the hardware installation and power-up of the Z9000 system, for software
configuration information, refer to the
FTOS Configuration Guide for the Z9000 System
and for
Command Line Interface (CLI) information, refer to the
FTOS Command Line Reference Guide for the
Z9000 System
.
NOTE:
The Z9000 system requires, at a minimum, Dell Force10 Operating System (FTOS) version 8.3.11.0.
CAUTION:
Wear grounding wrist straps when handling this equipment to avoid Electrostatic Discharge
(ESD) damage.
WARNING:
Only trained and qualified personnel can perform the installation of this equipment. Read this
guide before you install and power up the Z9000 system. This equipment contains two power cords.
Disconnect both power cords before servicing.
WARNING:
This equipment contains optical transceivers, which comply with the limits of Class 1 laser
radiation.
WARNING:
When no cable is connected, visible and invisible laser radiation may be emitted from the
aperture of the optical transceiver ports. Avoid exposure to laser radiation and do not stare into the open
apertures.
Related Publications
For more information about the Z9000 system, refer to the following documents:
FTOS Configuration Guide for the Z9000 System
FTOS Command Line Reference Guide for the Z9000 System
FTOS Release Not
es
for the Z9000 System
NOTE:
For the most recent documentation and software, visit iSupport (registration for access to some
sections is required):