Dell Force10 Z9000 Installing the Z9000 System - Page 25
Power Up Sequence, AC Power, To add AC power
View all Dell Force10 Z9000 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 25 highlights
WARNING: ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap when handling the Z9000 system and its components. Power Up Sequence When the system powers up, the fans come on at high speed. The fan speed slows as the system boots up. The SYS Light Emitting Diode (LED) does not light up until the boot-up sequence is complete. When the boot-up is complete, the SYS LED is steadily lit green. AC Power To add AC power, connect the plug to each AC power connector. Make sure the power cord is secure. As soon as the cable is connected between the Z9000 system and the power source, the system is powered-up; there is no on/off switch. DC Power To add DC power, follow these steps: Step Task 1 Remove the small plastic cover from the DC connectors. 2 Ensure that the power source is turned off. Do not attach the DC cable to the DC connectors while the power source is on. 3 Attach the connectors to the Power Supply Units (PSUs). Make sure the connections are secure. 4 Replace the plastic cover over the DC connectors. As soon as the cable is connected between the Z9000 system and the power source, the system is powered-up; there is no on/off switch. Install the Z9000 | 25