Dell PowerStore 3000X EMC PowerStore Network Configuration Guide for PowerSwit - Page 17

Sample: Network Setup Preparation Worksheet

Page 17 highlights

Sample: Network Setup Preparation Worksheet The Network Setup Preparation Worksheet has been completed with the network resources used in the configuration steps provided in this document. If you are not configuring your networks with the resources used in this guide, you can complete a new Network Setup Preparation Worksheet with the information relevant to your environment. To download a blank worksheet see Appendix C: PowerStore T model: Network Setup Preparation Worksheet (blank). See the PowerStore Network Planning Guide for details about reserving network resources. Table 5. PowerStore T model Network Setup Preparation Worksheet (example) Step Step details Notes 1. Print this table to record the reserved resources. 2. Print out the Initial Configuration Worksheet to record the additional network resources you will need to create networks in PowerStore T model the first time you create a cluster. 3. Determine which of the Top-of-Rack (ToR) switch ports will be connected to the PowerStore T model appliance base enclosure nodes. At a minimum, ports 0 and 1 on the node must be connected to the ToR switches. When cabling the nodes to the ToR switches: ● Port 0 and Port 1 on the same node must connect to opposite switches ● Port 0 on Node A, and Port 0 on Node B must connect to opposite switches ● Port 1 on Node A, and Port 1 on Node B must connect to opposite switches Record the ToR switch ports required to connect to: Node A, Port 0 to ToR 1 port 1 Node A, Port 1 to ToR 2 port 1 Node B, Port 0 to ToR 2 port 54 Node B, Port 1 to ToR 1 port 54 4. Record the out-of-band management switch ports to connect to: Node A management 1GbE port to OOB port 2 Node B management 1GbE port to OOB port 53 5. Optionally, record the port on the out-of-band (OOB) OOB port 1 management switch port to use for remote discovery. 6. Record the ports on the OOB management switch that will be used to connect to the uplinks. Management Uplink A to port 25 Management Uplink B to port 26 7. Record the VLAN IDs that will be used on the OOB management switch: Remote Discovery (untagged) 100 Management (untagged) 100 8. Record the VLAN IDs that will be used on the Top-of-Rack (ToR) switches: Storage network (tagged) 200 NAS (tagged) 300 Internal (untagged) 1 9. Reserve and record the IP addresses necessary to configure the switch below: Management IP address for out-of-band management switch 100.0.100.50/24 PowerStore T model: Before you begin 17

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93

Sample: Network Setup Preparation Worksheet
The
Network Setup Preparation Worksheet
has been completed with the network resources used in the configuration steps
provided in this document.
If you are not configuring your networks with the resources used in this guide, you can complete a new
Network Setup
Preparation Worksheet
with the information relevant to your environment. To download a blank worksheet see
Appendix C:
PowerStore T model: Network Setup Preparation Worksheet (blank)
.
See the
PowerStore Network Planning Guide
for details about reserving network resources.
Table 5. PowerStore T model Network Setup Preparation Worksheet (example)
Step
Step details
Notes
1.
Print this table to record the reserved resources.
2.
Print out the
Initial Configuration Worksheet
to record the additional network resources you will need to create
networks in PowerStore T model the first time you create a cluster.
3.
Determine which of the Top-of-Rack (ToR) switch ports will be connected to the PowerStore T model appliance base
enclosure nodes.
At a minimum, ports 0 and 1 on the node must be connected to the ToR switches. When cabling the nodes to the ToR
switches:
Port 0 and Port 1 on the same node must connect to opposite switches
Port 0 on Node A, and Port 0 on Node B must connect to opposite switches
Port 1 on Node A, and Port 1 on Node B must connect to opposite switches
Record the ToR switch ports required to connect to:
Node A, Port 0 to
ToR 1 port 1
Node A, Port 1 to
ToR 2 port 1
Node B, Port 0 to
ToR 2 port 54
Node B, Port 1 to
ToR 1 port 54
4.
Record the out-of-band management switch ports to connect to:
Node A management 1GbE port to
OOB port 2
Node B management 1GbE port to
OOB port 53
5.
Optionally, record the port on the out-of-band (OOB)
management switch port to use for remote discovery.
OOB port 1
6.
Record the ports on the OOB management switch that will be used to connect to the uplinks.
Management Uplink A to
port 25
Management Uplink B to
port 26
7.
Record the VLAN IDs that will be used on the OOB management switch:
Remote Discovery (untagged)
100
Management (untagged)
100
8.
Record the VLAN IDs that will be used on the Top-of-Rack (ToR) switches:
Storage network (tagged)
200
NAS (tagged)
300
Internal (untagged)
1
9.
Reserve and record the IP addresses necessary to configure the switch below:
Management IP address for out-of-band management
switch
100.0.100.50/24
PowerStore T model: Before you begin
17