Dell PowerStore 3000X EMC PowerStore Network Configuration Guide for PowerSwit - Page 91
PowerStore X model Network Setup Preparation, Worksheet
View all Dell PowerStore 3000X manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 91 highlights
Table 26. PowerStore T model Network Setup Preparation Worksheet (blank) (continued) Step Step details Notes Uplink B to ToR 2 15. Record the port channel ID used for connectivity between the ToR switches and the uplinks. If deploying with MC-LAG, enter the port channel ID used for the uplink. Only a single port channel ID is required for MC-LAG. Alternatively, record the uplink port channel IDs required for Reliable L2. Reliable L2 connectivity requires two port channel IDs. 1. Port channel ID for Reliable L2 2. Port channel ID for Reliable L2 16. As a best practice it is recommended to add a spanning tree protocol to the ToR switches. Record the spanning tree protocols to set on each switch. Spanning tree protocol for ToR switch 1 Spanning tree protocol for ToR switch 2 17. Once you have completed steps above, you have the necessary information to configure the switches. Continue to work with your network administrator to complete the Initial Configuration Worksheet now to ensure that: ● Your network configuration on the switch aligns with the network configuration that will be done in PowerStore T model. ● You reserve the necessary network resources to complete deployment of PowerStore T model and the PowerStore T model networks. 18. Determine if you will use a direct connection or a remote connection to discover your PowerStore. Once you have successfully discovered your PowerStore, you will be guided through the Initial Configuration Wizard to create your first PowerStore cluster. PowerStore X model Network Setup Preparation Worksheet Work with your network administrator to record the network resources required to configure your PowerStore X model switches and networks. Table 27. PowerStore X model Network Setup Preparation Worksheet (blank) Step Step details Notes 1. Print this table to record the reserved resources. 2. Print out the Initial Configuration Worksheet to record the additional network resources you will need to create networks in PowerStore X model the first time you create a cluster. 3. Determine which of the Top-of-Rack (ToR) switch ports will be connected to the PowerStore X model appliance base enclosure nodes. At a minimum, ports 0 and 1 on the node must be connected to the ToR switches. When cabling the nodes to the ToR switches: ● Port 0 and Port 1 on the same node must connect to opposite switches ● Port 0 on Node A, and Port 0 on Node B must connect to opposite switches ● Port 1 on Node A, and Port 1 on Node B must connect to opposite switches Record the ToR switch ports required to connect to: Node A, Port 0 to Network Setup Preparation Worksheets 91