Cable the Top-of-Rack switches to the core uplinks, Uplink A, Core uplinks

Page 36 highlights

Use two cables that support connectivity between the high speed ports, for example 100Gbps Direct Attached Cables (DAC). Table 11. Available switch-to-switch ports PowerSwitch S4148F-ON 100 GbE Ports 25, 26, 29, and 30 S4148T-ON 25, 26, 29, and 30 S5248F-ON 49-54 It is recommended that you use the same port numbers for the pair on the top and bottom switch. Table 12. Steps to connect the switches together 1 Connect 100 GbE port 25 of the bottom switch (1) to 100 GbE port 25 of the top switch (2). 2 Connect 100 GbE port 26 of the bottom switch (1) to 100 GbE port 26 of the top switch (2). Cable the Top-of-Rack switches to the core uplinks Cable the Top-of-Rack (ToR) switches to the core uplinks. Core uplinks Uplink A Uplink B 1 3 4 2 Figure 16. ToR switch connections to the core uplinks 36 PowerStore T model: Cabling the appliance to the switches

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93

Use two cables that support connectivity between the high speed ports, for example 100Gbps Direct Attached Cables (DAC).
Table 11. Available switch-to-switch ports
PowerSwitch
100 GbE Ports
S4148F-ON
25, 26, 29, and 30
S4148T-ON
25, 26, 29, and 30
S5248F-ON
49-54
It is recommended that you use the same port numbers for the pair on the top and bottom switch.
Table 12. Steps to connect the switches together
1
Connect 100 GbE port 25 of the bottom switch (1) to 100 GbE port 25 of the top switch (2).
2
Connect 100 GbE port 26 of the bottom switch (1) to 100 GbE port 26 of the top switch (2).
Cable the Top-of-Rack switches to the core uplinks
Cable the Top-of-Rack (ToR) switches to the core uplinks.
Uplink A
Uplink B
Core uplinks
3
4
1
2
Figure 16. ToR switch connections to the core uplinks
36
PowerStore T model: Cabling the appliance to the switches