Dell PowerStore 3000X EMC PowerStore Network Configuration Guide for PowerSwit - Page 89

Network Setup Preparation Worksheets, PowerStore T model: Network Setup Preparation Worksheet (blank

Page 89 highlights

D Network Setup Preparation Worksheets This appendix includes the following information. Topics: • PowerStore T model: Network Setup Preparation Worksheet (blank) • PowerStore X model Network Setup Preparation Worksheet PowerStore T model: Network Setup Preparation Worksheet (blank) Work with your network administrator to record the network resources required to configure your PowerStore T model switches and networks. This table assumes you have read through and are familiar with the network requirements described in the PowerStore Network Planning Guide. Table 26. PowerStore T model Network Setup Preparation Worksheet (blank) Step Step details Notes 1. Print this table to record the reserved resources. 2. Print out the Initial Configuration Worksheet to record the additional network resources you will need to create networks in PowerStore T model the first time you create a cluster. 3. Determine which of the Top-of-Rack (ToR) switch ports will be connected to the PowerStore T model appliance base enclosure nodes. At a minimum, ports 0 and 1 on the node must be connected to the ToR switches. When cabling the nodes to the ToR switches: ● Port 0 and Port 1 on the same node must connect to opposite switches ● Port 0 on Node A, and Port 0 on Node B must connect to opposite switches ● Port 1 on Node A, and Port 1 on Node B must connect to opposite switches Record the ToR switch ports required to connect to: Node A, Port 0 to Node A, Port 1 to Node B, Port 0 to Node B, Port 1 to 4. Record the out-of-band management switch ports to connect to: Node A management 1GbE port to Node B management 1GbE port to 5. Optionally, record the port on the out-of-band (OOB) management switch port to use for remote discovery. 6. Record the ports on the OOB management switch that will be used to connect to the uplinks. Management Uplink A to Management Uplink B to Network Setup Preparation Worksheets 89

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93

Network Setup Preparation Worksheets
This appendix includes the following information.
Topics:
PowerStore T model: Network Setup Preparation Worksheet (blank)
PowerStore X model Network Setup Preparation Worksheet
PowerStore T model: Network Setup Preparation
Worksheet (blank)
Work with your network administrator to record the network resources required to configure your PowerStore T model switches
and networks.
This table assumes you have read through and are familiar with the network requirements described in the PowerStore Network
Planning Guide.
Table 26. PowerStore T model Network Setup Preparation Worksheet (blank)
Step
Step details
Notes
1.
Print this table to record the reserved resources.
2.
Print out the
Initial Configuration Worksheet
to record the additional network resources you will need to create
networks in PowerStore T model the first time you create a cluster.
3.
Determine which of the Top-of-Rack (ToR) switch ports will be connected to the PowerStore T model appliance base
enclosure nodes.
At a minimum, ports 0 and 1 on the node must be connected to the ToR switches. When cabling the nodes to the ToR
switches:
Port 0 and Port 1 on the same node must connect to opposite switches
Port 0 on Node A, and Port 0 on Node B must connect to opposite switches
Port 1 on Node A, and Port 1 on Node B must connect to opposite switches
Record the ToR switch ports required to connect to:
Node A, Port 0 to
Node A, Port 1 to
Node B, Port 0 to
Node B, Port 1 to
4.
Record the out-of-band management switch ports to connect to:
Node A management 1GbE port to
Node B management 1GbE port to
5.
Optionally, record the port on the out-of-band (OOB)
management switch port to use for remote discovery.
6.
Record the ports on the OOB management switch that will be used to connect to the uplinks.
Management Uplink A to
Management Uplink B to
D
Network Setup Preparation Worksheets
89