Dell PowerStore 3000X EMC PowerStore Network Configuration Guide for PowerSwit - Page 93

Step details, Notes, Initial Configuration Wizard, Network Setup Preparation Worksheets

Page 93 highlights

Table 27. PowerStore X model Network Setup Preparation Worksheet (blank) (continued) Step Step details Notes 12. Record the port channel ID using for connectivity between the ToR switches, and the uplinks. If deploying with MC-LAG, enter the port channel ID for the uplink. Only a single port channel ID is required for MC-LAG. Alternatively, record the uplink port channel IDs required for Reliable L2. Reliable L2 connectivity requires two port channel IDs. 1. Port channel ID for Reliable L2 2. Port channel ID for Reliable L2 13. As a best practice it is recommended to add a spanning tree protocol to the ToR switches. Record the spanning tree protocols to set on each switch. Spanning tree protocol for ToR switch 1 Spanning tree protocol for ToR switch 2 14. Once you have completed steps above, you have the necessary information to configure the switches. Continue to work with your network administrator to complete the Initial Configuration Worksheet now to ensure that: ● Your network configuration on the switch aligns with the network configuration that will be done in PowerStore X model. ● You reserve the necessary network resources to complete deployment of PowerStore X model networks. 15. Determine if you will use a direct connection or a remote connection to discover your PowerStore. Once you have successfully discovered your PowerStore, you will be guided through the Initial Configuration Wizard to create your first PowerStore cluster. Network Setup Preparation Worksheets 93

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93

Table 27. PowerStore X model Network Setup Preparation Worksheet (blank) (continued)
Step
Step details
Notes
12.
Record the port channel ID using for connectivity between the ToR switches, and the uplinks.
If deploying with MC-LAG, enter the port channel ID for
the uplink.
Only a single port channel ID is required for MC-LAG.
Alternatively, record the uplink port channel IDs required for Reliable L2.
Reliable L2 connectivity requires two port channel IDs.
1. Port channel ID for Reliable L2
2. Port channel ID for Reliable L2
13.
As a best practice it is recommended to add a spanning tree protocol to the ToR switches. Record the spanning tree
protocols to set on each switch.
Spanning tree protocol for ToR switch 1
Spanning tree protocol for ToR switch 2
14.
Once you have completed steps above, you have the necessary information to configure the switches. Continue to
work with your network administrator to complete the
Initial Configuration Worksheet
now to ensure that:
Your network configuration on the switch aligns with the network configuration that will be done in PowerStore X
model.
You reserve the necessary network resources to complete deployment of PowerStore X model networks.
15.
Determine if you will use a direct connection or a remote connection to discover your PowerStore.
Once you have successfully discovered your PowerStore, you will be guided through the
Initial Configuration Wizard
to create your first PowerStore cluster.
Network Setup Preparation Worksheets
93