Dell Precision 610 Dell Precision WorkStation 610 Mini Tower Systems Service M - Page 80
NOTE: Be sure that the power requirements for both processors match., Otherwise, the CPU mismatch
View all Dell Precision 610 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 80 highlights
top bracket terminator card thumbscrews (4) SLOT 2_SEC connector If you are adding a second Pentium II Xeon processor to a single-Pentium II Xeon processor system, remove the terminator card from the secondary Slot 2 SEC cartridge connector (labeled "SLOT2_SEC"). NOTE: Be sure that the power requirements for both processors match. Otherwise, the CPU mismatch LED will light up and the system will not power on. 4-26 Dell Precision 610 Mini Tower Systems Service Manual
4-26
Dell Precision 610 Mini Tower Systems Service Manual
7HUPLQDWRU±&DUG±±±±±±±
If you are adding a second Pentium II Xeon processor to a single-Pentium II
Xeon processor system, remove the terminator card from the secondary Slot 2
SEC cartridge connector (labeled “SLOT2_SEC”).
NOTE: Be sure that the power requirements for both processors match.
Otherwise, the CPU mismatch LED will light up and the system will not
power on.
terminator card
top bracket
SLOT 2_SEC connector
thumbscrews (4)