HP StorageWorks 2/64 HP StorageWorks Core Switch 2/64 and SAN Director 2/128 I - Page 122

Replacing the WWN bezel

Page 122 highlights

CAUTION: Do not force the installation. If the part does not install easily, ensure that it is properly oriented. Replacing the WWN bezel Use these steps to reinstall the WWN bezel. 1. Orient the bezel on the chassis (see Figure 28); then, insert both retaining screws into the standoffs on the chassis and tighten to finger-tight. 2. In the CLI session, type continue to indicate that the replacement has been completed. Please enter the word `continue' after the new WWN card has been installed: continue Restoring the information to the replacement FRU now, please wait about 20 seconds to complete Verifying the replacement FRU now... WWN card hot swap is now complete. FRU replacement completed successfully! 3. Verify that the WWN card is correctly connected by checking the LEDs on the WWN card to see if they reflect the status of the components. NOTE: The LEDs might take up to 2 minutes after WWN card installation to begin functioning. 4. Pack the faulty WWN card in the packaging provided with the new card and return it to the switch supplier. 122 Installing FRUs

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166

Installing FRUs
122
CAUTION:
Do not force the installation. If the part does not install easily, ensure that it is
properly oriented.
Replacing the WWN bezel
Use these steps to reinstall the WWN bezel.
1.
Orient the bezel on the chassis (see
Figure 28
); then, insert both retaining screws into the
standoffs on the chassis and tighten to finger-tight.
2.
In the CLI session, type
continue
to indicate that the replacement has been completed.
3.
Verify that the WWN card is correctly connected by checking the LEDs on the WWN card
to see if they reflect the status of the components.
NOTE:
The LEDs might take up to 2 minutes after WWN card installation to begin
functioning.
4.
Pack the faulty WWN card in the packaging provided with the new card and return it to
the switch supplier.
Please enter the word `continue' after the new WWN card has
been installed: continue
Restoring the information to the replacement FRU now,
please wait about 20 seconds to complete
Verifying the replacement FRU now...
WWN card hot swap is now complete.
FRU replacement completed successfully!