HP StorageWorks 2/64 HP StorageWorks Core Switch 2/64 and SAN Director 2/128 I - Page 41

Securing the chassis to the rails

Page 41 highlights

4. Use the lift device to raise the chassis until the bottom of the chassis is level with the shelf-like surfaces of the rack mount shelf brackets. 5. Slide the chassis onto the two rack mount shelf brackets. Securing the chassis to the rails 1. Attach the two flat upper rack mount brackets (that you installed on the chassis earlier) to the two L-shaped brackets installed onto the rack rails. Use the two screws set aside in step 1 of "Attaching the upper rack mount bracket assemblies to the chassis" on page 38. See Figure 9. Figure 9 Attaching the upper rack mount bracket to the L-shaped brackets 2. Tighten screws, and torque to 32 inch-pounds. SHR-2513A Core Switch 2/64 and SAN Director 2/128 installation guide 41

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166

41
Core Switch 2/64 and SAN Director 2/128 installation guide
4.
Use the lift device to raise the chassis until the bottom of the chassis is level with the
shelf-like surfaces of the rack mount shelf brackets.
5.
Slide the chassis onto the two rack mount shelf brackets.
Securing the chassis to the rails
1.
Attach the two flat upper rack mount brackets (that you installed on the chassis earlier) to
the two L-shaped brackets installed onto the rack rails. Use the two screws set aside in
step 1
of ”
Attaching the upper rack mount bracket assemblies to the chassis
” on page 38.
See
Figure 9
.
Figure 9
Attaching the upper rack mount bracket to the L-shaped brackets
2.
Tighten screws, and torque to 32 inch-pounds.
SHR-2513A