HP StorageWorks 7410 HP StorageWorks Virtual Array va 7000 family - Installati - Page 22

Step 6. Power-on the array controller enclosure, Operating the Power/Standby Switch

Page 22 highlights

Step 6. Power-on the array controller enclosure a Push in the power/standby switch to the "ON" position. See Figure 11. Immediately after the array is powered on, each component in the array enclosure performs a power-on self-test. b Verify the power-on self-test passed: all LEDs should be solid green. During power-on self-test, the an initialization sequence is displayed followed by the Ready prompt. If the array does not display a Ready status, see "Solving Installation Problems" on page 48 for help in solving the problem. Figure 11 Operating the Power/Standby Switch 22 Virtual Array Installation Guide

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52

22
Virtual Array Installation Guide
Step 6. Power-on the array controller enclosure
a
Push in the power/standby switch to the “ON” position. See Figure 11.
Immediately after the array is powered on, each component in the
array enclosure performs a power-on self-test.
b
Verify the power-on self-test passed: all LEDs should be solid green.
During power-on self-test, the an initialization sequence is displayed
followed by the Ready prompt.
If the array does not display a Ready status, see
"Solving Installation
Problems" on page 48
for help in solving the problem.
Figure 11
Operating the Power/Standby Switch