Hitachi C8FSE Instruction Manual - Page 11
Preparation Before Operation
UPC - 717709012998
View all Hitachi C8FSE manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 11 highlights
PREPARATION BEFORE OPERATION Make the following preparations before operating the power tool: 1. Installation 5-13/16"(148mm) Base 5/16" (8mm) Bolt English 9-19/32" (244mm) 1" (25mm) thick bench 11/32" (9mm) 3 Holes 11-21/32" (296mm) Work Bench 5/16" (8mm) Nut Fig. 4 Attach the power tool to a level, horizontal work bench in accordance with Fig. 4. Select 5/16" (8mm) diameter bolts suitable in length for the thickness of the work bench. Bolt length should be at least 1-9/16" (40mm) plus the thickness of the work bench. For example, use 2-9/16" (65mm) or larger bolts for a 1" (25mm) thick work bench. The holder attached to the rear of the base helps stabilize the power tool. 6mm Bolt Holder adjustment: Loosen the 6mm bolt with the supplied 10mm box wrench. Adjust the holder until its bottom surface contacts the work bench surface. After adjustment, firmly tighten the 6mm bolt. Holder Adjust the holder until its bottom surface contacts the work bench surface. Move Fig. 5 2. Install the side handle (Fig. 6) Install the side handle that came enclosed with this unit. Turntable Side handle Fig. 6 Tighten 11