IBM 865951Y Hardware Maintenance Manual - Page 116

Installing the server in the rack enclosure, slide, until the slide rails click into place.

Page 116 highlights

Installing the server in the rack enclosure: In this section, you will use the following parts: Four long screws (M6 by 16 mm) Two cage nuts One cable-management arm Cable ties To install the server into the rack enclosure: 1. If you have not done so already, install a cage nut in each front mounting rail in the marked positions, as shown. 2. Position the Netfinity 5000 horizontally, with the 3.5-inch drive bays on the top. 3. Align the inner slides on the sides of the server with the slide rails; then, slide the server onto the outer slide, until the slide rails click into place. Note When the rack model is fully extended, safety latches on the slide rails lock into place. This prevents the server from being accidentally pulled out too far and dropped. To release the safety latch, press in. 108 Netfinity Server HMM

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220

Installing the server in the rack enclosure:
In this
section, you will use the following parts:
±
Four long screws (M6 by 16 mm)
±
Two cage nuts
±
One cable-management arm
±
Cable ties
To install the server into the rack enclosure:
1.
If you have not done so already, install a cage nut in
each front mounting rail in the marked positions, as
shown.
2.
Position the Netfinity 5000 horizontally, with the
3.5-inch drive bays on the top.
3.
Align the inner slides on the sides of the server with
the slide rails; then, slide the server onto the outer
slide, until the slide rails click into place.
Note
When the rack model is fully extended, safety
latches on the slide rails lock into place.
This
prevents the server from being accidentally pulled
out too far and dropped.
To release the safety
latch, press in.
108
Netfinity Server HMM