IBM 9114-275 Installation Guide - Page 55
Service Access Cover, Power Supply #1 Primary, Power Supply Filler Panel, Power Supply Release Handle
View all IBM 9114-275 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 55 highlights
a cam and helps pry the power supply from its connector located on the system backplane. 1 Service Access Cover 2 Power Supply Filler Panel 3 System Unit 4 Power Supply #1 (Primary) 5 Power Supply Release Handle 8. After the power supply is released from its connector, pull the power supply straight out from the system unit. Repeat this procedure for the secondary power supply, if it is installed. Chapter 3. Installing Options 39
a cam and helps pry the power supply from its connector located on the system backplane.
1
Service Access Cover
4
Power Supply #1 (Primary)
2
Power Supply Filler Panel
5
Power Supply Release Handle
3
System Unit
8.
After the power supply is released from its connector, pull the power supply straight out from the
system unit. Repeat this procedure for the secondary power supply, if it is installed.
Chapter 3. Installing Options
39