IBM HC10 User Guide - Page 36

Installing, blade, workstation, BladeCenter

Page 36 highlights

Installing the blade workstation in a BladeCenter unit The following illustration shows how to install the blade workstation into a typical BladeCenter unit. To install a blade workstation in a BladeCenter unit, complete the following steps. Statement 21: CAUTION: Hazardous energy is present when the blade is connected to the power source. Always replace the blade cover before installing the blade. 1. Read the safety information that begins on page v and "Installation guidelines" on page 15 through "Handling static-sensitive devices" on page 15. 2. If you have not done so already, install any optional devices that you want, such as DIMMs, in the blade workstation. 3. Select the bay for the blade workstation. Notes: a. When any blade workstation is in blade bay 7 through 14 (in a BladeCenter unit) or in blade bays 5 through 8 (in a BladeCenter T unit), power modules must be present in all four power-module bays. b. To help ensure proper cooling, performance, and system reliability, make sure that each of the blade bays on the front of the BladeCenter unit has a blade workstation or filler blade installed. Do not operate a BladeCenter unit for more than 1 minute or a BladeCenter T unit for more than 20 minutes without a blade workstation or filler blade installed in each blade bay. 4. Make sure that the release levers on the blade workstation are in the open position (perpendicular to the blade workstation). 5. Slide the blade workstation into the blade bay until it stops. The spring-loaded doors, farther back in the bay, that cover the bay opening move out of the way as you insert the blade workstation. 6. Push the release levers on the front of the blade workstation to the closed position. 7. Turn on the blade workstation (see "Turning on the blade workstation" on page 11 for instructions). 24 BladeCenter HC10 Type 7996: Installation and User's Guide

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74

Installing
the
blade
workstation
in
a
BladeCenter
unit
The
following
illustration
shows
how
to
install
the
blade
workstation
into
a
typical
BladeCenter
unit.
To
install
a
blade
workstation
in
a
BladeCenter
unit,
complete
the
following
steps.
Statement
21:
CAUTION:
Hazardous
energy
is
present
when
the
blade
is
connected
to
the
power
source.
Always
replace
the
blade
cover
before
installing
the
blade.
1.
Read
the
safety
information
that
begins
on
page
v
and
“Installation
guidelines”
on
page
15
through
“Handling
static-sensitive
devices”
on
page
15.
2.
If
you
have
not
done
so
already,
install
any
optional
devices
that
you
want,
such
as
DIMMs,
in
the
blade
workstation.
3.
Select
the
bay
for
the
blade
workstation.
Notes:
a.
When
any
blade
workstation
is
in
blade
bay
7
through
14
(in
a
BladeCenter
unit)
or
in
blade
bays
5
through
8
(in
a
BladeCenter
T
unit),
power
modules
must
be
present
in
all
four
power-module
bays.
b.
To
help
ensure
proper
cooling,
performance,
and
system
reliability,
make
sure
that
each
of
the
blade
bays
on
the
front
of
the
BladeCenter
unit
has
a
blade
workstation
or
filler
blade
installed.
Do
not
operate
a
BladeCenter
unit
for
more
than
1
minute
or
a
BladeCenter
T
unit
for
more
than
20
minutes
without
a
blade
workstation
or
filler
blade
installed
in
each
blade
bay.
4.
Make
sure
that
the
release
levers
on
the
blade
workstation
are
in
the
open
position
(perpendicular
to
the
blade
workstation).
5.
Slide
the
blade
workstation
into
the
blade
bay
until
it
stops.
The
spring-loaded
doors,
farther
back
in
the
bay,
that
cover
the
bay
opening
move
out
of
the
way
as
you
insert
the
blade
workstation.
6.
Push
the
release
levers
on
the
front
of
the
blade
workstation
to
the
closed
position.
7.
Turn
on
the
blade
workstation
(see
“Turning
on
the
blade
workstation”
on
page
11
for
instructions).
24
BladeCenter
HC10
Type
7996:
Installation
and
User’s
Guide