Netgear GS418TPP Hardware Installation Guide - Page 16
Step 3: Unpack the Switch, To check the package contents, Installation
View all Netgear GS418TPP manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 16 highlights
ProSAFE 16-Port Gigabit Smart Managed Switch with PoE+ and 2 SFP Ports You can also take the following steps to prevent damage from electrostatic discharge (ESD): • When unpacking a static-sensitive component from its shipping carton, leave it in the antistatic package until you are ready to install it. Just before unwrapping the antistatic package, discharge static electricity from your body. • Before moving a sensitive component, place it in an antistatic container or package. • Handle all sensitive components in a static-safe area. If possible, use antistatic floor pads, workbench pads, and an antistatic grounding strap. Step 3: Unpack the Switch The following figure shows the package contents. Figure 3. Switch package contents Check the contents of the boxes to make sure that all items are present before installing the switch. To check the package contents: 1. Place the container on a clean flat surface, and cut all straps securing the container. 2. Unpack the hardware from the boxes by carefully removing the hardware and placing it on a secure and clean surface. 3. Remove all packing material. 4. Verify that the package contains the following items: Installation 16