Brother International BE-1201B-AC Instruction Manual - English - Page 200

Display Example of Output Information

Page 200 highlights

Chapter 8 Creating Production Report Display Example of Output Information Displays the production information that are collected during the specified period. Display Total electricity supply time Total embroidering time Total actual embroidering time Excluded time Electricity supply efficiency Embroidering efficiency period Number Pattern name No. of stitches in pattern Total stitches (*) No. of colors in pattern (*) No. of times embroidered (*) No. of workpieces embroidered (*) Total no. of heads which are stopped Embroidering time (*) Actual embroidering time (*) Average embroidering speed Efficiency 1 (*) Efficiency 2 (*) Time stopped (*) Reason for stoppage (*) Contents Total time when the machine was energized within the specified period(**) Total time when the machine embroidered within the specified period Total actual time when the machine embroidered within the specified period Total time of intermission and maintenance for the number of days in the specified period Electricity supply efficiency by calculating below: (Total electricity supply time - excluded time) / total electricity supply time Ratio of the actual embroidering time to the total embroidering time Total actual embroidering time / total embroidering time The pattern embroidered during the specified period is numbered. Name of the pattern Number of stitches in the pattern Total number of stitches by repeating embroidering No. of stitches in pattern X No. of times embroidered Number of colors in the pattern Number of embroidering repeated Number of finished sheets by one embroidering cycle Total number of the heads at rest for one embroidering cycle Time from embroidering start to the end for the pattern Embroidering time from which the time for interruption, stop due to thread breakage, and stop due to error is excluded Average embroidering speed in the actual embroidering time (the number of stitches per minute) Total stitches/actual embroidering time Ratio of the actual embroidering time to the embroidering time for the pattern with time for interruption excluded Actual embroidering time/(embroidering time-time for interruption) Ratio of the actual embroidering time to the embroidering time Actual embroidering time / embroidering time Total of stop time during embroidering Reasons for stoppage are indicated. Refer to the next page. The items marked with "*" can be shown or hidden on the "Setting items to be displayed" screen. **) Electricity supply time is totaled per one day. 8-8 BE-0901E-AC-PC• BE-1201B-AC-PC

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233
  • 234
  • 235
  • 236
  • 237
  • 238
  • 239
  • 240
  • 241
  • 242
  • 243
  • 244
  • 245
  • 246

8-8
BE-0901E-AC-PC° BE-1201B-AC-PC
Chapter 8
Creating Production Report
Display Example of Output Information
Displays the production information that are collected during the specified period.
Display
Contents
Total electricity supply time
Total time when the machine was energized within the specified
period(**)
Total embroidering time
Total time when the machine embroidered within the specified
period
Total actual embroidering time
Total actual time when the machine embroidered within the
specified period
Excluded time
Total time of intermission and maintenance for the number of days
in the specified period
Electricity supply efficiency
Electricity supply efficiency by calculating below:
(Total electricity supply time - excluded time) / total electricity
supply time
Embroidering efficiency period
Ratio of the actual embroidering time to the total embroidering time
Total actual embroidering time / total embroidering time
Number
The pattern embroidered during the specified period is numbered.
Pattern name
Name of the pattern
No. of stitches in pattern
Number of stitches in the pattern
Total stitches (*)
Total number of stitches by repeating embroidering
No. of stitches in pattern X No. of times embroidered
No. of colors in pattern (*)
Number of colors in the pattern
No. of times embroidered (*)
Number of embroidering repeated
No. of workpieces embroidered (*)
Number of finished sheets by one embroidering cycle
Total no. of heads which are stopped
Total number of the heads at rest for one embroidering cycle
Embroidering time (*)
Time from embroidering start to the end for the pattern
Actual embroidering time (*)
Embroidering time from which the time for interruption, stop due to
thread breakage, and stop due to error is excluded
Average embroidering speed
Average embroidering speed in the actual embroidering time (the
number of stitches per minute)
Total stitches/actual embroidering time
Efficiency 1 (*)
Ratio of the actual embroidering time to the embroidering time for
the pattern with time for interruption excluded
Actual embroidering time/(embroidering time-time for interruption)
Efficiency 2 (*)
Ratio of the actual embroidering time to the embroidering time
Actual embroidering time / embroidering time
Time stopped (*)
Total of stop time during embroidering
Reason for stoppage (*)
Reasons for stoppage are indicated.
Refer to the next page.
The items marked with "*" can be shown or hidden on the "Setting items to be displayed" screen.
**) Electricity supply time is totaled per one day.