Cisco 7206VXR Installation Guide - Page 61
Product Overview, Environmental Monitoring and Reporting Functions
UPC - 746320975061
View all Cisco 7206VXR manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 61 highlights
Chapter 2 Preparing for Installation Site Requirements When you plan the location and layout of your equipment rack or wiring closet, you need to consider how air flows through your router. The Cisco 7206 draws cooling air in through the intake vent on the right side of the chassis (when you view the router from the front), and moves the air across the internal components and out the exhaust vent on the left side of the chassis. Temperature sensors on the network processing engine and I/O controller monitor the internal air temperature and send warning messages when the internal air temperature approaches a specified threshold. If the internal temperature exceeds the specified threshold, the system environmental monitor shuts down all internal power to prevent equipment damage from excessive heat. (See Chapter 1, "Product Overview," the "Environmental Monitoring and Reporting Functions" section on page 1-31 for temperature threshold information.) Figure 2-2 shows the airflow through the router. Figure 2-2 Internal Airflow-Top View Power supply end Exhaust air Inlet airflow H6237 Port adapter end The left and right sides of the chassis must remain unobstructed to ensure adequate airflow and prevent overheating inside the chassis; we recommend at least 3 in. (7.62 cm) of clearance. OL-5102-02 Cisco 7206 Installation and Configuration Guide 2-7