EMC CX500I Configuration Guide - Page 128
Fibre Channel Front-End Hardware Planning Worksheets
View all EMC CX500I manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 128 highlights
Storage-System Hardware Fibre Channel Front-End Hardware Planning Worksheets Following are worksheets to note hardware components you want. Some installation types do not have switches or multiple servers. Cable Planning Template for a Shared Storage System Adapter Adapter Adapter Adapter Adapter Adapter A1 A1 A2 A2 An An Cable Between Server and Switch Switch 1 D1 F2 Cable Between Switch and Storage System F2 F2 Path 1 Path 2 Path 3 Not Cabled Path 4 Not Cabled F2 F2 DAE2 LCC LCC DAE2 LCC LCC DAE2 LCC LCC DAE2 LCC LCC DAE2 LCC LCC DAE2 LCC LCC SP B SPE or DPE2 SP A Switch 2 Cable Between Enclosures F2 D1 F2 F2 F2 F2 EMC2449 Note: The cable identifiers apply to all storage systems, and are described on the following worksheet. 6-12 EMC CLARiiON CX300, CX500, CX500i, and CX700 Storage Systems Configuration Planning Guide