HP R1500 HP 3 Phase UPS User Guide - Page 28
Top entry, Wiring the terminal block
View all HP R1500 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 28 highlights
Top entry Use a Greenlee punch to provide one or more holes in the top of the wireway. Install one or more holes in the center rear of the top of the racks. NOTE: Top entry wiring does not interfere with access areas for the fans, connectors, breakers or X-Slot cards on any HP 3 Phase UPS. See the wireway label. Wiring the terminal block Connect the input, output and ground wires to the Power Bus Bar terminal block. Route the three input phases and the input neutral through the ferrite assembly. Wire gauge depends on overcurrent protection rating required. For more information, see "Installing in a parallel configuration (on page 26)." Reference the NEC, NFPA 70, for wire sizing. UPS installation 28
UPS installation 28
Top entry
Use a Greenlee punch to provide one or more holes in the top of the wireway. Install one or more holes in
the center rear of the top of the racks.
NOTE:
Top entry wiring does not interfere with access areas for the fans, connectors, breakers
or X-Slot cards on any HP 3 Phase UPS. See the wireway label.
Wiring the terminal block
Connect the input, output and ground wires to the Power Bus Bar terminal block. Route the three input phases
and the input neutral through the ferrite assembly.
Wire gauge depends on overcurrent protection rating required. For more information, see "Installing in a
parallel configuration (on page
26
)." Reference the NEC, NFPA 70, for wire sizing.