HP R1500 HP 3 Phase UPS User Guide - Page 31

Mount the remote REPO switch. HP recommends mounting the REPO switch near the operator's

Page 31 highlights

You can install an optional REPO circuit that shuts down the entire parallel system using a single switch. To install a REPO switch for a parallel system, the selected REPO command (NO or NC) contacts from each UPS in the system must be in parallel. To install a REPO switch for a parallel system: 1. Verify that the UPS system is powered down and all power sources are removed. For more information, see "Powering down the parallel system (on page 73)." 2. Mount the remote REPO switch. HP recommends mounting the REPO switch near the operator's consoles or near the exit doors. For enclosure dimensions and wiring knockouts, see the REPO switch manufacturer's installation instructions. UPS installation 31

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115

UPS installation 31
You can install an optional REPO circuit that shuts down the entire parallel system using a single switch. To
install a REPO switch for a parallel system, the selected REPO command (NO or NC) contacts from each UPS
in the system must be in parallel.
To install a REPO switch for a parallel system:
1.
Verify that the UPS system is powered down and all power sources are removed. For more information,
see "Powering down the parallel system (on page
73
)."
2.
Mount the remote REPO switch. HP recommends mounting the REPO switch near the operator's
consoles or near the exit doors. For enclosure dimensions and wiring knockouts, see the REPO switch
manufacturer's installation instructions.