HP R1500 HP 3 Phase UPS User Guide - Page 89

Testing the new battery module, Replacing the UPS

Page 89 highlights

4. Remove the UPS battery modules. To replace the component, reverse the removal procedure. IMPORTANT: Charge the batteries for at least 48 hours before supplying backup power to devices. The batteries charge to: • 80 percent of their capacity within 5 hours • 100 percent of their capacity within 48 hours Testing the new battery module NOTE: The batteries must be fully charged and the UPS must not be in Battery mode to perform the battery test. NOTE: For an accurate battery test, test the UPS with at least 10% load applied to the UPS. To test a new battery module: 1. Plug the UPS into a power outlet for 48 hours to charge the battery. 2. Press any button to activate the menu options. Select CONTROL and then START BATTERY TEST. During the battery test, the front panel displays "Battery Test Pending." A failed battery test initiates a Battery Test Failed alarm. To cancel a battery test in progress: 1. Press any button to activate the menu options. 2. Select CONTROL, START BATTERY TEST, and then CANCEL. Replacing the UPS To remove the UPS: 1. Power down all attached load devices. Maintenance 89

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115

Maintenance 89
4.
Remove the UPS battery modules.
To replace the component, reverse the removal procedure.
IMPORTANT:
Charge the batteries for at least 48 hours before supplying backup power to
devices. The batteries charge to:
80 percent of their capacity within 5 hours
100 percent of their capacity within 48 hours
Testing the new battery module
NOTE:
The batteries must be fully charged and the UPS must not be in Battery mode to
perform the battery test.
NOTE:
For an accurate battery test, test the UPS with at least 10% load applied to the UPS.
To test a new battery module:
1.
Plug the UPS into a power outlet for 48 hours to charge the battery.
2.
Press any button to activate the menu options. Select
CONTROL
and then
START BATTERY TEST
.
During the battery test, the front panel displays "Battery Test Pending."
A failed battery test initiates a Battery Test Failed alarm.
To cancel a battery test in progress:
1.
Press any button to activate the menu options.
2.
Select
CONTROL
,
START BATTERY TEST
, and then
CANCEL
.
Replacing the UPS
To remove the UPS:
1.
Power down all attached load devices.