3Ware 9650SE-8LPML-SGL Installation Guide - Page 36

Installation Instructions, Mate the connector on the BBU control module with

Page 36 highlights

Chapter 3. Installing the Battery Backup Unit Installation Instructions 1 Remove the screw head from the plastic post on the BBU control module and set it aside (you will reattach it soon.) Figure 24. Removing the head from the plastic post 2 Position the BBU control module above the controller and align the BBU control module and the controller, making sure to: „ Mate the connector on the BBU control module with the receptacle on the controller. „ Match the plastic post on the BBU with the hole on the controller. Figure 25. BBU control module ready to connect to the controller 32 3ware 9650SE Serial ATA RAID Controller Installation Guide

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45

Chapter 3. Installing the Battery Backup Unit
32
3ware 9650SE Serial ATA RAID Controller Installation Guide
Installation Instructions
1
Remove the screw head from the plastic post on the BBU
control module and set it aside (you will reattach it soon.)
Figure 24.
Removing the head from the plastic post
2
Position the BBU control module above the controller and align
the BBU control module and the controller, making sure to:
Mate the connector on the BBU control module with the
receptacle on the controller.
Match the plastic post on the BBU with the hole on the
controller.
Figure 25.
BBU control module ready to connect to the
controller