Acer Altos G710 Altos G710 User's Guide - Page 161
Install the M6 cage nuts see into the rail by following
View all Acer Altos G710 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 161 highlights
151 (2) Secure the side handles to the server using the eight hex head #6-32 screws (see page 147) from the rack mount kit. 6 Set the server aside. 7 Install the rack brackets to the rack by following the steps below: (1) Align the rack brackets to the mounting rail until the six screw holes become visible. (2) Secure the rack brackets to the mounting rails using the six M4 x L8 metal screws and nuts (see page 147) from the rack mount kit. Tighten the screws but leave them loose enough to allow length adjustment when installing the mounting rails to the rack. (3) Attach the other rack brackets to the remaining mounting rail. 8 Install the M6 cage nuts (see page 147) into the rail by following the steps below: (1) Insert the lower lip of the cage nut over the bottom of the opening at the back of a rail. (2) With your fingers, pinch the cage nut rack fastener and push in until the top lip locks into position.