Dell Z9100 EMC Networking with Isilon Front-End Deployment and Best Practices - Page 56

There will be one VLAN for each Isilon subnet; this will also include the, Next

Page 56 highlights

The upstream interfaces and port channels will be configured as follows: S4048-ON Leaf 3 interface port-channel50 description "Spine 1 and 2" no shutdown switchport mtu 9216 vlt-peer-lag port-channel 50 interface fo 1/49 description "Spine 1" no shutdown port-channel-protocol LACP port-channel 50 mode active mtu 9216 interface fo 1/50 description "Spine 2" no shutdown port-channel-protocol LACP port-channel 50 mode active mtu 9216 S4048-ON Leaf 4 interface port-channel50 description "Spine 1 and 2" no shutdown switchport mtu 9216 vlt-peer-lag port-channel 50 interface fo 1/49 description "Spine 1" no shutdown port-channel-protocol LACP port-channel 50 mode active mtu 9216 interface fo 1/50 description "Spine 2" no shutdown port-channel-protocol LACP port-channel 50 mode active mtu 9216 Next, we will create the VLANs. There will be one VLAN for each Isilon subnet; this will also include the servers in each rack. S4048-ON Leaf 3 interface vlan200 no shutdown untagged port-channel 1,3,5,101,102 tagged port-channel 50 S4048-ON Leaf 4 interface vlan200 no shutdown untagged port-channel 1,3,5,101,102 tagged port-channel 50 Uplink Failure Detection (UFD) is configured next. UFD shuts down all downstream interfaces if all uplinks fail. 56 Dell EMC Networking with Isilon Front-End Deployment and Best Practices Guide | version 1.0

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78

56
Dell EMC Networking with Isilon Front-End Deployment and Best Practices Guide | version 1.0
The upstream interfaces and port channels will be configured as follows:
S4048-ON Leaf 3
S4048-ON Leaf 4
interface port-channel50
description
Spine 1 and 2
no shutdown
switchport
mtu 9216
vlt-peer-lag port-channel 50
interface fo 1/49
description
Spine 1
no shutdown
port-channel-protocol LACP
port-channel 50 mode active
mtu 9216
interface fo 1/50
description
Spine 2
no shutdown
port-channel-protocol LACP
port-channel 50 mode active
mtu 9216
interface port-channel50
description
Spine 1 and 2
no shutdown
switchport
mtu 9216
vlt-peer-lag port-channel 50
interface fo 1/49
description
Spine 1
no shutdown
port-channel-protocol LACP
port-channel 50 mode active
mtu 9216
interface fo 1/50
description
Spine 2
no shutdown
port-channel-protocol LACP
port-channel 50 mode active
mtu 9216
Next, we will create the VLANs.
There will be one VLAN for each Isilon subnet; this will also include the
servers in each rack.
S4048-ON Leaf 3
S4048-ON Leaf 4
interface vlan200
no shutdown
untagged port-channel 1,3,5,101,102
tagged port-channel 50
interface vlan200
no shutdown
untagged port-channel 1,3,5,101,102
tagged port-channel 50
Uplink Failure Detection (UFD) is configured next.
UFD shuts down all downstream interfaces if all uplinks
fail.