HP EVA P6550 HP P6000 EVA Updating Product Software Guide (XCS 11200000) (5697 - Page 9

Preparing for the upgrade, Task checklist

Page 9 highlights

2 Preparing for the upgrade HP recommends that before starting the XCS upgrade, you perform tasks listed in Table 2 (page 9) to minimize the time required to complete the upgrade. The tasks you perform depend on your system configuration and the HP P6000 Command View implementation. These tasks focus on upgrading system components to ensure they meet the supported configuration for XCS 11200000. NOTE: Be sure to record the XCS controller software version you are using. You will need this information in the event that you must restore your XCS controller software. To create a restore CD, see Creating a CD from the XCS Controller Software .ISO Image Read This First for your array model (HP P6000 EVA or HP EVAx400). Task checklist Use the following checklist to track your progress and mark when a pre-upgrade task is complete. Table 2 Pre-upgrade task checklist Task "Checking the controller software version" (page 10) Time required: About 5 minutes When to perform: Anytime before the upgrade Task complete "Checking management software versions" (page 11) Time required: 10-15 minutes When to perform: Anytime before the upgrade "Checking the array hardware" (page 12) Time required: 15-20 minutes When to perform: 1-2 weeks before the upgrade, and then daily until the upgrade is complete. Provide enough time to order and replace any failed components. "Checking and upgrading your SAN infrastructure" (page 14) Time required: After collecting and evaluating your configuration data on over several weeks, you can determine when is an appropriate time to do the upgrade. When to perform: Anytime before the upgrade "Evaluating your configuration" (page 21) Time required: Varies When to perform: As close as possible to the upgrade "Selecting a time to perform an online upgrade" (page 23) Time required: Varies When to perform: As close as possible to the upgrade "Managing host I/O timeouts for an online upgrade" (page 27) Time required: Varies When to perform: As close as possible to the upgrade "Managing application I/O timeouts for an online upgrade" (page 31) Time required: Varies When to perform: As close as possible to the upgrade Task checklist 9

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73

2 Preparing for the upgrade
HP recommends that before starting the XCS upgrade, you perform tasks listed in
Table 2 (page
9)
to minimize the time required to complete the upgrade. The tasks you perform depend on your
system configuration and the HP P6000 Command View implementation. These tasks focus on
upgrading system components to ensure they meet the supported configuration for XCS 11200000.
NOTE:
Be sure to record the XCS controller software version you are using. You will need this
information in the event that you must restore your XCS controller software. To create a restore
CD, see
Creating a CD from the XCS Controller Software .ISO Image Read This First
for your array
model (HP P6000 EVA or HP EVAx400).
Task checklist
Use the following checklist to track your progress and mark when a pre-upgrade task is complete.
Table 2 Pre-upgrade task checklist
Task complete
Task
“Checking the controller software version” (page 10)
Time required:
About 5 minutes
When to perform:
Anytime before the upgrade
“Checking management software versions” (page 11)
Time required:
10–15 minutes
When to perform:
Anytime before the upgrade
“Checking the array hardware” (page 12)
Time required:
15–20 minutes
When to perform:
1–2 weeks before the upgrade, and then daily until the upgrade is complete.
Provide enough time to order and replace any failed components.
“Checking and upgrading your SAN infrastructure” (page 14)
Time required:
After collecting and evaluating your configuration data on over several weeks,
you can determine when is an appropriate time to do the upgrade.
When to perform:
Anytime before the upgrade
“Evaluating your configuration” (page 21)
Time required:
Varies
When to perform:
As close as possible to the upgrade
“Selecting a time to perform an online upgrade” (page 23)
Time required:
Varies
When to perform:
As close as possible to the upgrade
“Managing host I/O timeouts for an online upgrade” (page 27)
Time required:
Varies
When to perform:
As close as possible to the upgrade
“Managing application I/O timeouts for an online upgrade” (page 31)
Time required:
Varies
When to perform:
As close as possible to the upgrade
Task checklist
9