IBM 86802SY Hardware Maintenance Manual - Page 132
Installing and Removing the Server from a Rack, Preparing the Rack
![]() |
UPC - 087944496816
View all IBM 86802SY manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 132 highlights
Installing and Removing the Server from a Rack During the installation procedure, you must install parts on the rack and the server. This process can be divided into two parts: Preparing the rack Installing the server in the rack Preparing the Rack 32 kg (70.5 lbs) 55 kg (121.2 lbs) Caution Use safe lifting practices when lifting your machine. . In this section, you will use the following parts: IBM installation template Two slide-bracket assemblies One cable-management arm One server bracket (for attaching the cable-management arm to the server) Four lift handles Sixteen long screws (M6 by 16 mm) Eight short screws (M4 by 8 mm) Six cage nuts Four nut bars Two hex nuts (M6) 124 Netfinity Server HMM
![](/manual_guide/products/ibm-86803ru-hardware-maintenance-manual-dc70288/132.png)
Installing and Removing the Server
from a Rack
During the installation procedure, you must install parts on
the rack and the server.
This process can be divided into
two parts:
±
Preparing the rack
±
Installing the server in the rack
Preparing the Rack
Caution
Use safe lifting practices when lifting your machine.
.
In this section, you will use the following parts:
±
IBM installation template
±
Two slide-bracket assemblies
±
One cable-management arm
±
One server bracket (for attaching the
cable-management arm to the server)
±
Four lift handles
±
Sixteen long screws (M6 by 16
mm)
±
Eight short screws (M4 by 8
mm)
±
Six cage nuts
±
Four nut bars
±
Two hex nuts (M6)
±
32 kg (70.5 lbs)
±
55 kg (121.2 lbs)
124
Netfinity Server HMM