LG LP070HED1 Service Manual - Page 42
Subbase
![]() |
View all LG LP070HED1 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 42 highlights
5. Replace the escutcheon with the one from this kit by inserting the tabs at the top of the escutcheon into the retaining holes and laying the escutcheon flat on the control panel. 6. Replace the front by reversing steps 1 through 4. 7. Store the control knobs and escutcheon just removed from the unit for possible reinstallation if the wall thermostat is no longer desired. Figure 57 Escutcheon Installation The installation and servicing of the equipment referred to in this booklet should be performed by qualified, experienced technicians. WARNING Hazardous Voltage! Disconnect all electric power, including remote disconnects before servicing. Follow proper lockout/ tagout procedures to ensure the power can not be inadvertently energized. Failure to disconnect power before servicing could result in death or serious injury. Subbase Part No: AYSB3101 (265V 20A) AYSB4101 (265V 30A) Important Note: The unit OFF switch does not disconnect all electrical power to this unit. CAUTION Use Copper Conductors Only! Unit terminals are not designed to accept other types of conductors. Failure to use copper conductors may result in equipment damage. Note: When using a subbase, the wall sleeve must be installed a minimum of 3-1/4 inches (83 mm) above a finished floor and a minimum of 2-3/4 inches (70 mm) from a finished wall. Description The subbase may be installed on the wall sleeve before or after installing the wall sleeve. The subbase is prewired. Electrical connections can be made on the left side after the access cover is removed. A grounding screw is provided. Receiving Upon receipt of the product, inspect the shipping carton for signs of visible damage. Report any damage or shortage to the carrier and note it on the delivery receipt. The unit must be stored in its original shipping carton in a dry, secure place prior to its installation and use. 1. Remove parts B and C (Figure 58, next page) from the subbase and join together using two metal screws provided. This assembly now becomes the right front cover (Part F) of the subbase. (Figure 58, next page) 2. Position subbase under the front of the wall sleeve. 3. Align the back edge of the flange on cover A (Figure 54, next page) to front of the wall sleeve flange. (Figure 60, next page) 4. Drill four 1/8 inch holes in wall sleeve to line up with holes in subbase. (Figure 58, Location D, next page) Mount subbase to wall sleeve with four sheet metal screws provided with kit. (Figure 58, Location D, next page) 5. Remove the left front cover from the subbase. (Figure 58, Part A, next page) 6. Position skirting on each side of wall sleeve to prevent the entry of foreign materials. Trim skirting to desired length. Attach skirting with four sheet metal screws provided with kit. (Figure 58, Location E, next page) 7. Wire subbase for appropriate voltage (Figure 61, next page). -42- Downloaded from www.Manualslib.com manuals search engine
![](/manual_guide/products/lg-lp070hed1-service-manual-8185f34/42.png)