Cisco 7206VXR Configuration Guide - Page 105
Installing the NPE-G1 and NPE-G2 Cable-Management Brackets on a Front-Mounted Router
UPC - 746320975061
View all Cisco 7206VXR manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 105 highlights
Chapter 3 Installing a Cisco 7200 VXR Router Rack-Mounting a Cisco 7200 VXR Router Figure 3-7 Installing the Rack-Mount Brackets on the Front of the Chassis so the Front Is Recessed in the Rack 5 2 1 ENABLED 0 3 1 Cisco 7200 Series ENABLED PCMCIA EN TD TC RD RC LB CD TD TC RD RC LB CD TD TC RD RC LB CD TD TC RD RC LB CD 3 0 1 LINK 2 3 ENABLED ETHERNET 10BT FAST SERIAL TX EN RX 0 SLOT 1 EJECT SLOT 0 MII FE II MEN RJE4N5 RJL4IN5K R 1O POWK RJ-45 RX CPU RESET 1 0 TX RX 0 2 MII 1 LINK TX RJ45 RX 3 2 TX TOKEN RING 6 FAST ETHERNET 4 ETHERNET-10BFL 2 FAST ETHERNET INPUT/OUTPUT CONTROLLER 0 RX 4 3 TX 1 2 1 Rack-mount bracket 2 Cable-management bracket 84545 Step 5 Repeat Step 1 through Step 4 for the other rack-mount bracket and cable-management bracket (if required). This completes the procedure for installing the rack-mount and cable-management brackets on a Cisco 7200 VXR router for a front rack-mount configuration. Installing the NPE-G1 and NPE-G2 Cable-Management Brackets on a Front-Mounted Router You can install Cisco 7200 VXR routers standard cable-management brackets or an optical cablemanagement bracket on the NPE-G1 or NPE-G2. • To install the standard cable-management brackets on a Cisco 7200 VXR router with an NPE-G1 or NPE-G2 installed, see the "Installing the Cable-Management Brackets" section on page 3-15. • To install the optical cable-management bracket on an NPE-G1 or NPE-G2 in a Cisco 7200 VXR router, see the "Installing the NPE-G1 and NPE-G2 Optical Cable-Management Bracket" section on page 3-11. OL-5013-09 Cisco 7200 VXR Installation and Configuration Guide 3-9