Cisco 7206VXR Configuration Guide - Page 4

Preparing for Installation, Installing a Cisco 7200 VXR Router - npe g2 configuration

Page 4 highlights

Contents Functional Overview 1-53 Chassis Slot and Logical Interface Numbering 1-54 MAC Address 1-57 Online Insertion and Removal 1-57 Environmental Monitoring and Reporting Functions 1-59 Environmental Monitoring 1-59 Reporting Functions 1-62 Fan Failures 1-64 2 C H A P T E R Preparing for Installation 2-1 Tools and Parts Required 2-1 Electrical Equipment Guidelines 2-2 Preventing Electrostatic Discharge Damage 2-2 Site Requirement Guidelines 2-3 Rack-Mounting Guidelines 2-5 Temperature and Humidity Requirements 2-7 Power Connection Guidelines 2-8 Plant Wiring Guidelines 2-8 Interference Considerations 2-8 Distance Limitations and Interface Specifications 2-9 Initial Configuration Information 2-9 Cisco 7200 VXR Router Installation Checklist 2-10 Checking the Shipping Container Contents 2-12 Site Log 2-13 3 C H A P T E R Installing a Cisco 7200 VXR Router 3-1 Rack-Mounting a Cisco 7200 VXR Router 3-2 Attaching the Chassis Rack-Mount and Cable-Management Brackets 3-7 Installing the Brackets on the Front of the Chassis 3-8 Installing the NPE-G1 and NPE-G2 Cable-Management Brackets on a Front-Mounted Router 3-9 Installing the NPE-G1 and NPE-G2 Optical Cable-Management Bracket 3-11 Installing the Brackets on the Rear of the Chassis 3-11 Installing the NPE-G1 and NPE-G2 Cable-Management Brackets on a Rear-Mounted Router 3-13 Installing the Chassis in the Rack 3-14 General Tabletop or Workbench Installation 3-14 Installing the Cable-Management Brackets 3-15 Securing the Port Adapter Cables 3-16 Cisco 7200 VXR Installation and Configuration Guide 4 OL-5013-09

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188

Contents
4
Cisco 7200 VXR Installation and Configuration Guide
OL-5013-09
Functional Overview
1-53
Chassis Slot and Logical Interface Numbering
1-54
MAC Address
1-57
Online Insertion and Removal
1-57
Environmental Monitoring and Reporting Functions
1-59
Environmental Monitoring
1-59
Reporting Functions
1-62
Fan Failures
1-64
CHAPTER
2
Preparing for Installation
2-1
Tools and Parts Required
2-1
Electrical Equipment Guidelines
2-2
Preventing Electrostatic Discharge Damage
2-2
Site Requirement Guidelines
2-3
Rack-Mounting Guidelines
2-5
Temperature and Humidity Requirements
2-7
Power Connection Guidelines
2-8
Plant Wiring Guidelines
2-8
Interference Considerations
2-8
Distance Limitations and Interface Specifications
2-9
Initial Configuration Information
2-9
Cisco 7200 VXR Router Installation Checklist
2-10
Checking the Shipping Container Contents
2-12
Site Log
2-13
CHAPTER
3
Installing a Cisco 7200 VXR Router
3-1
Rack-Mounting a Cisco 7200 VXR Router
3-2
Attaching the Chassis Rack-Mount and Cable-Management Brackets
3-7
Installing the Brackets on the Front of the Chassis
3-8
Installing the NPE-G1 and NPE-G2 Cable-Management Brackets on a Front-Mounted
Router
3-9
Installing the NPE-G1 and NPE-G2 Optical Cable-Management Bracket
3-11
Installing the Brackets on the Rear of the Chassis
3-11
Installing the NPE-G1 and NPE-G2 Cable-Management Brackets on a Rear-Mounted
Router
3-13
Installing the Chassis in the Rack
3-14
General Tabletop or Workbench Installation
3-14
Installing the Cable-Management Brackets
3-15
Securing the Port Adapter Cables
3-16