Cisco 7206VXR Configuration Guide - Page 93

Verified By, Installation Checklist copied

Page 93 highlights

Chapter 2 Preparing for Installation Cisco 7200 VXR Router Installation Checklist Table 2-2 Cisco 7200 VXR Router Installation Checklist Task Verified By Date Date router received Router and all accessories unpacked Types and numbers of interfaces verified Safety recommendations and guidelines reviewed Installation Checklist copied Site log established and background information entered Site power voltages verified Site environmental specifications verified Required passwords, IP addresses, device names, and so on, available Required tools available Network connection equipment available Router mounted in rack (optional) Cable-management brackets installed (optional but recommended) AC power cable(s) connected to AC source(s) and router; retention clip secured DC power cable(s) connected to DC source(s) and router Captive installation screws on I/O controller and network processing engine or network services engine checked Network interface cables and devices connected ASCII terminal attached to console port Console port set for 9600 baud, 8 data bits, no parity, and 2 stop bits (9600 8N2) System power turned on (DC OK LED is on) System boot complete (I/O controller enabled LED is on) I/O controller, network processing engine or network services engine, and all port adapters operational (enabled LEDs on the port adapters and the I/O controller are on) Correct hardware configuration displayed after system banner appears System ready for global and interface-specific configuration OL-5013-09 Cisco 7200 VXR Installation and Configuration Guide 2-11

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188

2-11
Cisco 7200 VXR Installation and Configuration Guide
OL-5013-09
Chapter 2
Preparing for Installation
Cisco 7200 VXR Router Installation Checklist
Table 2-2
Cisco 7200 VXR Router Installation Checklist
Task
Verified By
Date
Date router received
Router and all accessories unpacked
Types and numbers of interfaces verified
Safety recommendations and guidelines reviewed
Installation Checklist copied
Site log established and background information entered
Site power voltages verified
Site environmental specifications verified
Required passwords, IP addresses, device names, and so on, available
Required tools available
Network connection equipment available
Router mounted in rack (optional)
Cable-management brackets installed (optional but recommended)
AC power cable(s) connected to AC source(s) and router; retention clip secured
DC power cable(s) connected to DC source(s) and router
Captive installation screws on I/O controller and network processing engine or network services
engine checked
Network interface cables and devices connected
ASCII terminal attached to console port
Console port set for 9600 baud, 8 data bits, no parity, and 2 stop bits (9600 8N2)
System power turned on (DC OK LED is on)
System boot complete (I/O controller enabled LED is on)
I/O controller, network processing engine or network services engine, and all port adapters
operational (enabled LEDs on the port adapters and the I/O controller are on)
Correct hardware configuration displayed after system banner appears
System ready for global and interface-specific configuration