Compaq ProLiant 800 ProLiant 800 Servers Supporting Pentium II Processors and - Page 121
Index, ART Automatic Revision Tracking, assembly
View all Compaq ProLiant 800 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 121 highlights
Index A access panels kit, part number 1-3 left side part number 1-3 removing 2-5 removing, illustrated 2-5 replacing 2-5 top part number 1-3 removing 2-8 removing, illustrated 2-8 replacing 2-8 U-channel part number 1-3 removing 2-7 removing, illustrated 2-7 replacing 2-7 activity LED, identified 4-9 advanced VGA board, test error codes 3-27 Array Configuration Utility, accessing 3-2, 3-3 ART (Automatic Revision Tracking), assembly version 3-62 ASR-2 booting into Compaq Utilities 3-55 booting into operating system 3-58 configuring 3-50 default value 3-53 description 3-50 flow chart, illustrated 3-54 for remote and off-site servers 3-53 hardware requirements 3-52 security 3-59 timer 3-53 Asset Management, defined 3-66 audible beeps, POST error messages 3-4 Automatic Data Collection, defined 3-66 Automatic Revision Tracking (ART) See ART Automatic Server Recovery-2 See ASR-2 B battery installing 2-27 installing, illustrated 2-27 jumper location, illustrated 4-7 replacement, part number 1-3 Index-1 bays CD-ROM drive, illustrated 2-9 diskette drive, illustrated 2-9 hard drive, illustrated 2-9 removable media, illustrated 2-9 beeps, during POST 3-4 bezel, front part number 1-3 removing 2-4 removing, illustrated 2-4 replacing 2-4 buns, part number 1-4 bus/core frequency switch default setting, illustrated 4-5, 4-6 location, illustrated 4-5, 4-6 C cables CD-ROM drive, accessing 2-8 data, part number 1-4 diskette drive accessing 2-5 folding and routing 2-13 power, part number 1-4 signal, specifications 5-6 folding and routing diagrams 2-13 IDE/CD-ROM signal, specifications 5-6 power switch, removing 2-19 SCSI drive power, specifications 5-7 Wide SCSI signal, specifications 5-7 cartons, part number 1-4 cautions battery 2-27 cooling 2-3 electrostatic discharge 2-2 Erase Utility 3-2 explanation vii grounding viii overheating viii removing covers 2-3 reseating cables 2-10 ROM upgrade 3-65 symbols in equipment 2-2 ventilation clearances viii CD-ROM drive access speed 5-5 accessing 2-5 bay location, illustrated 2-9 cable folding and routing 2-13 cables, accessing 2-8 Compaq ProLiant 800 Servers Maintenance and Service Guide