Gateway E-9525R Gateway E-9525R Server User Guide - Page 20
Setting Up Your Server
View all Gateway E-9525R manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 20 highlights
CHAPTER 2: Setting Up Your Server 3 Align the slots in the back server rails with the studs on the side of the server, then engage the slots with the studs and slide the rail forward until it stops. Locking screw (installed) Back server rail Stud (installed) Stud 4 Align the locking screw holes in the rails with the threaded screw holes in the server, then install one locking screw through the each back server rail. 5 Attach one mounting nut to each of the two front cabinet posts where you plan to install the server. Front cabinet post Mounting nut 14
CHAPTER 2: Setting Up Your Server
14
3
Align the slots in the back server rails with the studs on the side of the server, then engage
the slots with the studs and slide the rail forward until it stops.
4
Align the locking screw holes in the rails with the threaded screw holes in the server, then
install one locking screw through the each back server rail.
5
Attach one mounting nut to each of the two front cabinet posts where you plan to install
the server.
Stud
Stud
Locking screw (installed)
Back server rail
(installed)
Front cabinet post
Mounting nut