Gateway E-9525R Gateway E-9525R Server User Guide - Page 35

Installing Components

Page 35 highlights

CHAPTER 4 Installing Components • Preparing to install components • Preventing static electricity discharge • Opening the server case • Closing the server case • Installing and removing drives • Installing memory • Installing and removing PCI expansion cards • Replacing system fans • Replacing or adding a processor • Replacing a power supply module • Replacing the RPS power distribution module • Replacing the hot-swap backplane • Installing and removing the ROMB battery pack for the mezzanine RAID card • Installing and removing an optional mezzanine board • Replacing the CMOS battery • Replacing the control panel adapter card • Replacing the system board 29

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120

CHAPTER
4
29
Installing Components
Preparing to install components
Preventing static electricity discharge
Opening the server case
Closing the server case
Installing and removing drives
Installing memory
Installing and removing PCI expansion cards
Replacing system fans
Replacing or adding a processor
Replacing a power supply module
Replacing the RPS power distribution module
Replacing the hot-swap backplane
Installing and removing the ROMB battery pack for
the mezzanine RAID card
Installing and removing an optional mezzanine
board
Replacing the CMOS battery
Replacing the control panel adapter card
Replacing the system board