Brother International BES-1260BC Instruction Manual - English - Page 26
Preparation of needle bar case, to the left.
View all Brother International BES-1260BC manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 26 highlights
2-3 Preparation of needle bar case s BES-960BC Chapter 2 Preparation of Embroidery Machine 1. Loosen the bolt q, and move the needle case w to the left. 2. Press the change bracket collar r against the change case base e on the light, while pressing the change bracket collar t against the change case base y on the left, and tighten the bolt q. Check that needles at needle bar No.1 and 9 are inserted into the needle plate holes smoothly. Notes) • Check that the connecting shaft u does not have backlash in the horizontal direction. • If the bolt i of the change bracket collar on the right is loosened, it may be dislocated during adjustment of the needle bar case w. Do not loosen this bolt. BES-960BC • BES-1260BC 31
Chapter 2
Preparation of Embroidery Machine
BES-960BC
•
BES-1260BC
31
2-3 Preparation of needle bar case
■
BES-960BC
1.
Loosen the bolt
q
, and move the needle case
w
to the left.
2.
Press the change bracket collar
r
against the change case base
e
on the light, while pressing
the change bracket collar
t
against the change case base
y
on the left, and tighten the bolt
q
. Check that needles at needle bar No.1 and 9 are inserted into the needle plate holes
smoothly.
Notes)
• Check that the connecting shaft
u
does not have backlash in the horizontal direction.
• If the bolt
i
of the change bracket collar on the right is loosened, it may be dislocated during adjust-
ment of the needle bar case
w
. Do not loosen this bolt.