HP 11622 HP Rack Options Installation Guide for the 11000 G2 Series Rack and t - Page 56
Installing the ground bonding rack option kit on fan kits
![]() |
View all HP 11622 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 56 highlights
Installing the ground bonding rack option kit on fan kits From the grounding lug on the rack top to the grounding lug on the fan kit: 1. Place one end of a 15.24-cm (6-inch) grounding strap over the grounding lug on the rack top. 2. Place an M8 internal serrated lock washer and an M8 hex nut over the grounding lug on the rack top, and then tighten the washer. 3. Place the other end of the same grounding strap over the grounding lug on the perforated panel. 4. Place an M8 internal serrated lock washer and an M8 hex nut over the grounding lug on the perforated panel, and then tighten the washer. From the grounding lug on the fan kit to the grounding lug on the egress slot: 1. Place one end of a 36.83-cm (14.5-inch) grounding strap over the grounding lug on the fan kit. 2. Place an M8 internal serrated lock washer and an M8 hex nut over the grounding lug on the fan kit, and then tighten the washer. 3. Place the other end of the same grounding strap over the grounding lug on the egress slot. Ground Bonding kit 56
![](/manual_guide/products/hewlettpackard-11622-hp-rack-options-installation-guide-11000-g2-series-rack-hp-intelligent-series-racks-d56d586/56.png)